Kļava 100 — building area 100 m2
Living area 80 m2. Compact project of a single-storey residential house with 3 separate bedrooms. The project has Arka-B's characteristic glazing for bright and cozy interiors. In the owner's block, its own bathroom and dressing room.

3 separate bedrooms
Living room combined with kitchen
2 separate bathrooms
Master-bedroom block with dressing room and bathroom
Maple 100 compact model for a classic house with modern glazing
The house will suit those who need 3 separate bedrooms, but still want a relatively small, economically maintainable house. The characteristic glazing of Arka-B will create a light and warm atmosphere, the high ceiling of the living room to the roof peak will expand the space and create additional comfort.
Maple 100 compact model for a classic house with modern glazing
The house will suit those who need 3 separate bedrooms, but still want a relatively small, economically maintainable house. The characteristic glazing of Arka-B will create a light and warm atmosphere, the high ceiling of the living room to the roof peak will expand the space and create additional comfort.
Project prices
Foundations, finished house from the outside, inside to interior works (stage 1)
Foundations, finished house from the outside, inside to interior works (stage 1)
Slab foundations - preparation of the base, sand, chips, geotextile, extruded polystyrene foam, reinforced concrete slab, plinth finishing
HORIZONTAL exterior trim board, double painted
Rodent barrier 25mm
Fiberboard 22mm
Wood grade C24 calibrated, dried, planed
OSB moisture-resistant plate 12 mm thick
Insulation 250 mm
PHR 25/560 (Classic Klik) Roof profile, RR2H3 Rough Matt (Matt)
C24 class timber for rafters
Insulation 300 mm
Roof wind box - trim board, built-in anti-insect mesh
Wood grade C24 calibrated, dried, planed; Accoustic mineral wool
Finishing board for skirting boards and corners, as well as window and doorways
Exterior finish board paint, 2 times painted
PVC 3-pane double-glazed windows
Wooden construction front door
Includes everything in the basic set plus interior work (stage 2)
120 points, including up to 2gb outdoor lights and 4gb outdoor sockets. Each switch, lamp or socket is a single point. Ivory switches and sockets. For outdoor lighting. Luminaires in the house - 6w LED light panels.
Electrical wires embedded in halogen-free, self-extinguishing corrugations.
Class 33 laminate
Finished with painted/stained wagon tile or with plasterboard in 2 layers (stitched, stamped, primed and painted in the tone chosen by the customer)
Finished with painted/stained wagon tile or with plasterboard in 1 layer (stitched, stamped, primed and painted in the tone chosen by the customer)
box, pliers, handles - complete set
Tile or vinyl
Plasterboard painted with spec paint, or tiles
Plywood/Plastic/Plywood
Attaching the pot, boiler, sink, taps (work)
Wireless control panel Ajax HUB 2 Plus; FireProtect 2 RB (Heat/Smoke); Ajax WaterStop
Combined heat pump from Midea /boiler enclosure
Centralized recovery system
Foundations, finished house from the outside, inside to interior works (stage 1)
Slab foundations - preparation of the base, sand, chips, geotextile, extruded polystyrene foam, reinforced concrete slab, plinth finishing
HORIZONTAL exterior trim board, double painted
Rodent barrier 25mm
Fiberboard 22mm
Wood grade C24 calibrated, dried, planed
OSB moisture-resistant plate 12 mm thick
Insulation 250 mm
PHR 25/560 (Classic Klik) Roof profile, RR2H3 Rough Matt (Matt)
C24 class timber for rafters
Insulation 300 mm
Roof wind box - trim board, built-in anti-insect mesh
Wood grade C24 calibrated, dried, planed; Accoustic mineral wool
Finishing board for skirting boards and corners, as well as window and doorways
Exterior finish board paint, 2 times painted
PVC 3-pane double-glazed windows
Wooden construction front door
120 points, including up to 2gb outdoor lights and 4gb outdoor sockets. Each switch, lamp or socket is a single point. Ivory switches and sockets. For outdoor lighting. Luminaires in the house - 6w LED light panels.
Electrical wires embedded in halogen-free, self-extinguishing corrugations.
Class 33 laminate
Finished with painted/stained wagon tile or with plasterboard in 2 layers (stitched, stamped, primed and painted in the tone chosen by the customer)
Finished with painted/stained wagon tile or with plasterboard in 1 layer (stitched, stamped, primed and painted in the tone chosen by the customer)
box, pliers, handles - complete set
Tile or vinyl
Plasterboard painted with spec paint, or tiles
Plywood/Plastic/Plywood
Attaching the pot, boiler, sink, taps (work)
Wireless control panel Ajax HUB 2 Plus; FireProtect 2 RB (Heat/Smoke); Ajax WaterStop
Combined heat pump from Midea /boiler enclosure
Centralized recovery system
Foundations, finished house from the outside, inside to interior works (stage 1)
Slab foundations - preparation of the base, sand, chips, geotextile, extruded polystyrene foam, reinforced concrete slab, plinth finishing
HORIZONTAL exterior trim board, double painted
Rodent barrier 25mm
Fiberboard 22mm
Wood grade C24 calibrated, dried, planed
OSB moisture-resistant plate 12 mm thick
Insulation 250 mm
PHR 25/560 (Classic Klik) Roof profile, RR2H3 Rough Matt (Matt)
C24 class timber for rafters
Insulation 300 mm
Roof wind box - trim board, built-in anti-insect mesh
Wood grade C24 calibrated, dried, planed; Accoustic mineral wool
Finishing board for skirting boards and corners, as well as window and doorways
Exterior finish board paint, 2 times painted
PVC 3-pane double-glazed windows
Wooden construction front door
Depends on geographical location
Architect's services — preparation and coordination of the project in the building board ensures compliance with regulations and obtaining building permits.
Surveyor services — construction axis and height markers for laying foundations ensure precise placement of foundations and compliance with the project.
Terrace construction — a stable and aesthetic terrace with sustainable pavement that expands the residential outdoor space.
Construction of a car canopy — a practical canopy for a car or equipment with a stable structure and quick installation.
Possible additional costs
Kitchen equipment and other furniture are not included in the price. Note that in addition, you will need to install an external sewer, add water and supply electricity to the building. If you take out a loan for the construction of a building, the bank will also require the installation of paths and a seeding.
- External engineering communications (electricity, water, sewerage).
- Landscaping of the plot (paving, fence, lawn).
- Furniture and household appliances.
- Plumbing in the bathroom — we do the assembly.
Depends on geographical location
Architect's services — preparation and coordination of the project in the building board ensures compliance with regulations and obtaining building permits.
Surveyor services — construction axis and height markers for laying foundations ensure precise placement of foundations and compliance with the project.
Terrace construction — a stable and aesthetic terrace with sustainable pavement that expands the residential outdoor space.
Construction of a car canopy — a practical canopy for a car or equipment with a stable structure and quick installation.
Possible additional costs
Kitchen equipment and other furniture are not included in the price. Note that in addition, you will need to install an external sewer, add water and supply electricity to the building. If you take out a loan for the construction of a building, the bank will also require the installation of paths and a seeding.
- External engineering communications (electricity, water, sewerage).
- Landscaping of the plot (paving, fence, lawn).
- Furniture and household appliances.
- Plumbing in the bathroom — we do the assembly.

Split structure of payment
As standard, we work with a following payment structure, but if the cost order established by the bank differs, we adapt and find a common solution
€4000
After the conclusion of the Agreement
30%
After obtaining a building permit
20%
After pouring the foundation
30%
After assembling the panels of the house
15%
After the drywall is laid
5%
After signing the act of acceptance-transfer
Completed projects
Interested?
Feel free to contact us if you have any questions or would like a quote. Fill out the form and we will contact you in the next day!


.png)
.png)



