
Mežrozīte 38 — Modular house
Mežrozīte 38 is suitable if you want to install a sauna in your holiday home. Perfect for a holiday home, camping or residential house for 1 person. The loft will serve as an additional sleeping place or headquarters for the youngest vacationers. We deliver the house whole and place it on our pre-prepared foundation.

Living room combined with kitchen
A shabby bedroom
Saunas
Lofts
The largest of our modular homes, suitable for installing a sauna
Suitable if you also want to install a sauna in your holiday home. We make and carry out a finished house and place it on pre-prepared foundations of concrete pillars. We also build the foundations ourselves. The house is fully finished, equipped with an air-to-air heat pump and decentralized recuperation.
The largest of our modular homes, suitable for installing a sauna
Suitable if you also want to install a sauna in your holiday home. We make and carry out a finished house and place it on pre-prepared foundations of concrete pillars. We also build the foundations ourselves. The house is fully finished, equipped with an air-to-air heat pump and decentralized recuperation.
Project prices
Foundations, exterior work, interior work
Foundations, exterior work, interior work
Development of documents of the manufacturer for submission to the construction board (for obtaining a building permit)
Punctuated concrete foundations. Concrete poles — 1m deep, D=160mm; about 70 pcs. The foundations between the posts are lined with geotextile and lined with dolomite rubble
Anti-rodent mesh over the entire bottom of the floor
C24 class timber calibrated, dried, planed.
Black floor dorelis+floor plasterboard
Insulation 200 mm
HORIZONTAL exterior trim board, double painted
Rodent barrier 25mm
OSB moisture-resistant plate 10 mm thick
Wood grade C24 calibrated, dried, planed
Insulation 200 mm
C24 class wood calibrated, dried, planed; Door impregnated 18mm
Construction of an elevation of the attic wall (threshold wall) 80 cmin height
PHR 25/560 (Classic Klik) Roof profile, RR2H3 Rough Matt (Matt)
C24 class timber for rafters
Insulation 200 mm
Roof wind box - trim board, built-in anti-insect mesh
C24 grade wood calibrated, dried, planed; Accoustic 75mm mineral wool in two layers;
Finishing board for skirting boards and corners, as well as window and doorways
Exterior finish board paint, 2 times painted
PVC 3-pane double-glazed windows
Wooden construction front door
3-row distribution with 36 machines. Up to 80 points. Switches and sockets. Outdoor lighting at the door, inside LED luminaires.
Electrical wires embedded in halogen-free, self-extinguishing corrugations.
Class 33 laminate
Finished with painted/stained wagon tile or with plasterboard in 2 layers (stitched, stamped, primed and painted in the tone chosen by the customer)
Finished with painted/stained wagon tile or with plasterboard in 1 layer (stitched, stamped, primed and painted in the tone chosen by the customer)
box, pliers, handles - complete set
Tile or vinyl
Plasterboard painted with spec paint, or tiles
Plywood/Plastic/Plywood
Attaching the pot, boiler, sink, taps (work)
Wireless control panel Ajax HUB 2 Plus; FireProtect 2 RB (Heat/Smoke); Ajax WaterStop
Wall decoration, laminate or soft covering on the floor
Foundations, exterior work, interior work
Development of documents of the manufacturer for submission to the construction board (for obtaining a building permit)
Punctuated concrete foundations. Concrete poles — 1m deep, D=160mm; about 70 pcs. The foundations between the posts are lined with geotextile and lined with dolomite rubble
Anti-rodent mesh over the entire bottom of the floor
C24 class timber calibrated, dried, planed.
Black floor dorelis+floor plasterboard
Insulation 200 mm
HORIZONTAL exterior trim board, double painted
Rodent barrier 25mm
OSB moisture-resistant plate 10 mm thick
Wood grade C24 calibrated, dried, planed
Insulation 200 mm
C24 class wood calibrated, dried, planed; Door impregnated 18mm
Construction of an elevation of the attic wall (threshold wall) 80 cmin height
PHR 25/560 (Classic Klik) Roof profile, RR2H3 Rough Matt (Matt)
C24 class timber for rafters
Insulation 200 mm
Roof wind box - trim board, built-in anti-insect mesh
C24 grade wood calibrated, dried, planed; Accoustic 75mm mineral wool in two layers;
Finishing board for skirting boards and corners, as well as window and doorways
Exterior finish board paint, 2 times painted
PVC 3-pane double-glazed windows
Wooden construction front door
3-row distribution with 36 machines. Up to 80 points. Switches and sockets. Outdoor lighting at the door, inside LED luminaires.
Electrical wires embedded in halogen-free, self-extinguishing corrugations.
Class 33 laminate
Finished with painted/stained wagon tile or with plasterboard in 2 layers (stitched, stamped, primed and painted in the tone chosen by the customer)
Finished with painted/stained wagon tile or with plasterboard in 1 layer (stitched, stamped, primed and painted in the tone chosen by the customer)
box, pliers, handles - complete set
Tile or vinyl
Plasterboard painted with spec paint, or tiles
Plywood/Plastic/Plywood
Attaching the pot, boiler, sink, taps (work)
Wireless control panel Ajax HUB 2 Plus; FireProtect 2 RB (Heat/Smoke); Ajax WaterStop
Wall decoration, laminate or soft covering on the floor
Foundations, exterior work, interior work
Development of documents of the manufacturer for submission to the construction board (for obtaining a building permit)
Punctuated concrete foundations. Concrete poles — 1m deep, D=160mm; about 70 pcs. The foundations between the posts are lined with geotextile and lined with dolomite rubble
Anti-rodent mesh over the entire bottom of the floor
C24 class timber calibrated, dried, planed.
Black floor dorelis+floor plasterboard
Insulation 200 mm
HORIZONTAL exterior trim board, double painted
Rodent barrier 25mm
OSB moisture-resistant plate 10 mm thick
Wood grade C24 calibrated, dried, planed
Insulation 200 mm
C24 class wood calibrated, dried, planed; Door impregnated 18mm
Construction of an elevation of the attic wall (threshold wall) 80 cmin height
PHR 25/560 (Classic Klik) Roof profile, RR2H3 Rough Matt (Matt)
C24 class timber for rafters
Insulation 200 mm
Roof wind box - trim board, built-in anti-insect mesh
C24 grade wood calibrated, dried, planed; Accoustic 75mm mineral wool in two layers;
Finishing board for skirting boards and corners, as well as window and doorways
Exterior finish board paint, 2 times painted
PVC 3-pane double-glazed windows
Wooden construction front door
Laminated chipboard for furniture, surface HPL
Metal, wood
Electric warm floor with thermostat — efficient and easily adjustable underfloor heating that ensures even comfort.
Depends on geographical location
Postponement of the construction axis and the height mark for laying the foundation
Sauna room and lavas embroidered with black alder. The floor is tiled.
Possible additional costs
The price does not include kitchen equipment, furniture and stairs to the loft. Note that in addition, you will need to install an external sewer, add water and supply electricity to the building. In the absence of our own sewer masters and furniture makers, we will recommend our cooperation partners.
- External engineering communications (electricity, water, sewerage).
- Landscaping of the plot (paving, fence, lawn).
- Furniture and household appliances.
- Plumbing in the bathroom — we do the assembly.

Laminated chipboard for furniture, surface HPL
Metal, wood
Electric warm floor with thermostat — efficient and easily adjustable underfloor heating that ensures even comfort.
Depends on geographical location
Postponement of the construction axis and the height mark for laying the foundation
Sauna room and lavas embroidered with black alder. The floor is tiled.
Possible additional costs
The price does not include kitchen equipment, furniture and stairs to the loft. Note that in addition, you will need to install an external sewer, add water and supply electricity to the building. In the absence of our own sewer masters and furniture makers, we will recommend our cooperation partners.
- External engineering communications (electricity, water, sewerage).
- Landscaping of the plot (paving, fence, lawn).
- Furniture and household appliances.
- Plumbing in the bathroom — we do the assembly.

Split structure of payment
As standard, we work with a following payment structure, but if the cost order established by the bank differs, we adapt and find a common solution
€2000
After the conclusion of the Agreement
40%
After obtaining a building permit
40%
After completing the full exterior decoration
10%
After delivery of the house on the plot
10%
After signing the act of acceptance-transfer
Completed projects
Interested?
Feel free to contact us if you have any questions or would like a quote. Fill out the form and we will contact you in the next day!

.png)

.png)

.png)





















